Service Centers

August 13, 2014
New Slitting Facility at Heidtman Steel to Begin Production in September
Written by Sandy Williams
Ohio-based service center Heidtman Steel announced production for its new slitting facility in East Chicago, Ind. is expected to begin in early September. Installation of equipment is nearly complete and trial runs will begin later this month. Full production is anticipated by October.
The 120,000 sq. ft. facility houses an Alcos brand Advance High Strength Steel (AHSS) slitter capable of slitting material in thicknesses from .015 to .250, and in widths up to 78 inches. The line will handle coils up to 70,000 lbs., and 84 inches in diameter. In addition to AHSS products, the line will be able to precision-slit a full range of carbon flat rolled steel products, including surface critical HRPO, cold rolled, galvanized, galvannealed and galvalume.


