SMU Data and Models

October 8, 2015
Steel Mill Lead Times: Still One Week Shorter than Year Ago Levels
Written by John Packard
Flat rolled steel mill lead times remain historically short as the domestic mills struggle to keep their mills full. Based on the results from this week’s flat rolled steel market analysis (survey) we are seeing lead times at least one week shorter than this time last year on all products with the exception of Galvalume.
Hot rolled lead times remained about the same as what has been reported over the last couple of months. The average lead time based on our respondents was 3.19 weeks compared to 3.04 weeks (statistically insignificant) two weeks ago and 3.11 weeks at the beginning of September.


